Logistics Centre in Carregado. – Steel framed shed 170m long x 115m wide x 18m clear internal height

Storage area: 18.600m², Clear headroom: 19.2m
Office building with 2 elevated floors totaling 2.200m² plus an elevated carpark with 1.980m²
Client: Grupo Luis Simões S.A.
Lead Consultant (Architect): Arquitecto Vitor André
Lead Contractor: Aníbal Oliveira Cristina, Lda
Structural steelwork Sub-contractor: Martifer SGPS
Main quantities:
Slabs on ground – 15.350m
Concrete – 13.530m³
Reinforcing steel – 1.480 tons
Structural steelwork – 1.780 tons
Precast concrete panels – 800m²

Other projects:


“Chagas Ltd” Warehouse in Torres Vedras
Logistics Centre at Huambo, Angola. Includes 13 steel framed buildings and composite floors with a total area of 50.000m²
"SIEMENS" Eletronic Processors Plant in Beja
Industrial building in Alverca – 12.000m², area and 10m height
Waste Treatment Plant, Macau
"ESTELIM" Paint Plant in Setúbal
"KOMAX" Plant in Abóboda
"SIAF" Plant in Mangualde
"SOMIT" Plant in Oliveira do Hospital
"FINAGRA" winery in Reguengos de Monsaraz
"LEVIRA" Steelworks in Oliveira do Bairro

BACK TO THE TOP